glue the second roof ring together
make 8 more rafters
add the pins to the second set of door frames
assemble the second khana (we're ripping the last of the wood tomorrow)
Modify roof #2
Cut and hem the second set of wall canvas
Paint the second ger (khana is pre painted prior to assembly already)
And I have 2 weeks to do this. Its gonna be busy but can do most of the canvas work while I watch tv at night and I plan to glue the ring tonight. My goal is to set up both gers with canvas in 2 weeks. That leaves 2 weekends to repack the camp gear and resupply.
No comments:
Post a Comment